Skip to main content

Driveway Specialists

Driveway Paving Questions, Answered

Before the job

Are you licensed and insured?
It depends on the base. A sound base means quick resurfacing. A failed base means digging out, rebuilding and compacting first. We give a timeframe after seeing the drive, not before.

The base, the size and fall, access for machines, and what has to come out first. Two drives that look alike from the street can differ underneath, so we quote after a visit.

Cars, bins, boats, planters and anything on or beside the drive. Tell us about buried wire or irrigation lines we cannot see. We walk the drive with you beforehand.

Rough length and width, age of the surface, what is going wrong, access limits like narrow streets or low trees, and where the water goes. Rough is fine to book a visit.

Weather and timing

What does the weather do to the schedule?

Rain and cold both delay work. Water ruins a base, and asphalt that cools too fast before compaction does not bond. We would rather move the job than pave badly, and we call if dates change.

Not straight away. New asphalt stays soft after the crew leaves, longer in heat and shade. We tell you on the day when it is safe. Until then, keep cars, bikes and foot traffic off.
Turning the wheel while stopped twists the tire against a soft new surface and scuffs it. Keep the car rolling as you turn, and vary where you park through the first season.

Lifespan and repair

How long will a new driveway last?
We will not quote a number; anyone who does is guessing. It comes down to the base, drainage, tree roots and the loads it carries. Sandy, free-draining ground treats a drive better than clay.
Frost. Water enters cracks, freezes and widens them, and every thaw repeats it. Edges go first because they lack support on one side and take tire and plow loads.
Sometimes. If the base is sound and damage is local, a patch is honest. If the base is soft or wet, a patch fails within a season or two. We check the base first and tell you which case you have.
Plows catch unprotected edges and pull them apart. The edge detail is part of our work. Mark the drive’s edges with stakes for your plow contractor and ask for a higher blade on the new surface.

Other questions

Do you work on the apron where my drive meets the road?
It depends who owns the road. On a town road, the apron and curb cut are the town’s business. In a private way, they belong to the owners. We explain how it applies on the visit.
Yes. We are a paving and hardscape contractor, so walkways, patios and retaining walls are part of the work. The same questions about base and drainage apply to all of it.

Next step

Call Driveway Specialists on (413) 337-3772, or send the form on the contact page. Tell us what the driveway is doing and we will arrange a time to see it.